A layout with purpose
Room connections, storage and daily routines planned around what your unit and its structure actually allow.
A connected home, shaped around your routines. One team for the layout, the approvals and the build.
Free consultationA condo renovation connects more than rooms. We consider the layout, shared building services, storage and finishes together, then carry one coordinated plan through approvals and construction.
Room connections, storage and daily routines planned around what your unit and its structure actually allow.
Drawings, alteration applications, insurance certificates and building access coordinated before work begins.
Kitchens, bathrooms, millwork and flooring considered together, with one crew carrying the work through to handover.
Six coordinated stages, with design and building approvals running together wherever possible.
We measure the unit as built and establish what it will allow — where the stacks and ducts run, which partitions are structural, what the declaration and the board actually permit. Every layout that follows is drawn against those limits rather than around them, which is what stops a design being redrawn after it has been priced.
Two or three plan options tested against how you live, each carrying its own cost. Then elevations, millwork details, electrical and lighting, and a drawing set complete enough that your property manager accepts it for approval and the crew builds from it without interpreting anything twice.
The alteration application, certificates of insurance naming the corporation, permits where the scope needs them, and the elevator and loading dock booked. This is the stage most renovations quietly lose weeks to. It comes off your desk entirely and runs in parallel with design rather than after it.
Protection first — your floors, the corridor, the elevator lobby, the neighbours’ doors — then demolition done carefully, because what is behind the wall decides the rest of the job. Framing, plumbing, electrical and HVAC set out from the drawings and inspected before anything closes.
Level substrates. Blocking behind every fixture that will ever be leaned on. Waterproofing built for the fact that your floor is someone else’s ceiling. Acoustic underlay to the standard your building specifies. None of it photographs, and all of it is why the finish still reads as considered in ten years.
Kitchen, baths, millwork, flooring, paint and fixtures installed in the order that keeps each one undamaged by the next. Then a walkthrough together, the list made on the spot and fixed rather than scheduled, the site left clean, and your two-year workmanship warranty issued in writing.
Well-planned millwork gives each room a purpose without asking it to do more than its footprint allows. We draw the storage around the way you live.
We will not publish a per-square-foot number, because in a condo it is close to meaningless — two units of identical size can differ by a factor of three. These are the five things that genuinely move it.
Kitchens and bathrooms carry most of the cost of any condo renovation, because they concentrate plumbing, tile, waterproofing, stone, cabinetry and appliances into small areas. A two-bath unit is a materially different project from a one-bath unit, far more than the square footage suggests.
Removing a non-structural partition is routine. Anything touching a structural element, a shear wall or a mechanical shaft needs engineering, board review and often a permit, which adds both cost and calendar. We tell you which category your idea falls into at the walkthrough.
Custom cabinetry is usually the largest single line in a high-end condo renovation, and it is where the difference between a good unit and an ordinary one is most visible. Full-height runs, integrated storage and fitted closets cost real money and return most of it in how the unit lives and shows.
Two identical bathrooms can differ by twenty thousand dollars on fixtures and stone alone. This is the part you control completely, and the part our estimator will price for you in about two minutes without asking for anything.
Restricted work hours, a single service elevator, a long carry from the loading dock, strict noise rules — these do not change the drawings but they do change the labour. A building with tight logistics genuinely costs more to work in, and any estimate that ignores that is one that will move later.
The two rooms that carry most of a condo renovation, in detail.
Cost, timeline and the board — the three people ask about first.
For a typical one- or two-bedroom unit, six to ten weeks on site, and roughly eleven to sixteen weeks from first call to handover once design, selections and board approval are counted. Those front stages run in parallel wherever possible rather than stacking, which is most of why our schedules hold.
Before HST, a full condo renovation typically runs $90,000–$160,000+, and flooring and paint alone $8,000–$18,000. Within that range, it depends far more on how many wet rooms you touch and what you specify than on floor area, which is why we won’t quote a per-square-foot figure. After a walkthrough you get a written price and completion date: a fixed price for defined scope, or cost-plus with a guaranteed maximum when the scope is still open.
For a full gut, we normally recommend staying elsewhere — there will be stretches with no kitchen and no water. For a partial scope the work area is sealed behind dust barriers and the site is left clean nightly, and plenty of clients stay. Because our projects run in weeks rather than months, the window stays short and, more usefully, predictable.
Yes, in full. We prepare and submit the alteration package, issue certificates of insurance naming the corporation, book the elevator and loading dock, and chase the approval. You sign the application; we do the rest. Property managers notice which contractors handle this properly, which is a large part of why second approvals go smoothly.
You see it before it is covered. We photograph it, price the remedy, and bring you both before carrying on. Older Toronto buildings hide plenty — cast iron stacks, undersized wiring, previous work done badly — and no estimate can see through drywall. What we can promise is that you never find out about it on the invoice.
Condos are the specialty and most of what we do, because the constraints reward knowing them. We take on houses and larger scopes too, held to the same standard.
Usually two separate approvals, and people often mix them up. Your condo board has to approve almost anything beyond paint, through an alteration agreement, a certificate of insurance naming the corporation, and sometimes a deposit. A City of Toronto building permit is needed when the work changes structure, moves or adds plumbing, or affects a fire separation. New electrical circuits also need an ESA permit. Cosmetic work and like-for-like replacements usually need neither permit, though the board still wants to know. We prepare all of it and tell you at the walkthrough which ones your scope needs.
Yes. In a concrete tower, most walls between the kitchen and living room aren’t structural, but some hide plumbing, ducts or a column, and a few are shear walls that can’t be touched. We find out which before we draw anything, then bring in an engineer and get the board’s approval if the wall needs it. Opening up a condo kitchen usually means rethinking the lighting and the range hood too, because you’ll see both from the sofa.
Yes, we’ve renovated a Yorkville penthouse. Penthouses tend to come with more custom millwork, bigger stone and glass, and boards that look closely at anything happening on the top floor. One thing worth checking early: large slabs and long millwork runs have to fit in the service elevator, and it’s easy to find that out too late.
Google, HomeStars and Houzz are the usual places. Reviews help, but for a full renovation also ask the contractor for a finished unit you can see and a past client you can call. Ask how it went with the board and the neighbours, and whether it finished on the date in the contract.
An hour on site, then a fixed price and a completion date in writing.