Kitchen renovation

Room to cook.
Space to gather.

Thoughtful layouts, fitted cabinetry and carefully chosen materials. A kitchen that works as well as it looks.

Free consultation

Good kitchens begin with the way you use them.

We start with the workflow and the services, then resolve cabinetry, appliances, lighting and surfaces as one plan. Every choice has a place before the installation begins.

A practical working layout

Preparation, cooking and storage planned together, with space to move and a clear understanding of where services can run.

Cabinetry made to fit

Full-height storage, useful drawers and appliance integration drawn for your room and the things you keep in it.

Details that work together

Stone, backsplash, tapware and task lighting coordinated early, with lead times checked before installation is scheduled.

Every decision, in the right order.

Six connected stages take the kitchen from a workable layout to the final adjustment of each door and drawer.

01

Layout and workflow

Where the drain stack sits decides most of what follows, so that gets established first. From there we test the layouts your unit will actually allow — where the sink can land, whether an island is feasible without coring the slab, how two people move through the space at once. You see the cost implication of each option before you choose one.

02

Cabinetry and millwork

Drawn to your unit rather than ordered from a size chart. Full-height runs that use the ceiling instead of leaving a dust shelf, drawer boxes that hold weight, soft-close hardware, and interiors fitted to what you own — deep drawers for pots, a proper pantry pull-out, a place for the things that otherwise live on the counter.

03

Counters and backsplash

Stone selected as a slab, not from a sample chip, with the veining laid out before it is cut. Waterfall ends, mitred edges and matched backsplashes where the material justifies it. We confirm lead times before anything else is ordered, because stone is the item most likely to hold up a finish date.

04

Appliances and services

Specified early, because appliance dimensions drive cabinet dimensions and not the other way around. Panel-ready integration where you want the run uninterrupted, 24-inch fitting where the space is tight, and a check of your panel capacity before anyone commits to an induction range and a wall oven on the same circuit.

05

Ventilation and lighting

Most condos cannot vent to the exterior, so the honest answer is a recirculating hood with carbon filtration sized properly for the cooktop — done well it is genuinely effective, and done badly it is a decorative box. Lighting is planned to fall on the counter rather than the back of your head, with under-cabinet runs and switching set out before the walls close.

06

Install and finish

Trades sequenced so nothing finished gets damaged by what comes after it. Cabinets set level to the slab rather than the floor, doors aligned to a consistent reveal, stone templated after the boxes are in. The last week is adjustment, not construction.

Illustration of precise kitchen cabinetry with fitted drawer storage, stone counters and a tiled backsplash

The difference is in the daily details.

A kitchen earns its place through the things you touch every day: drawers that hold what you need, useful counter space and light exactly where you work.

  • Fitted storage for the way you cook
  • Countertops set out before fabrication
  • Appliances specified before cabinet dimensions
  • Lighting and ventilation planned with the services
  • Installation sequenced to protect each finish
Explore our projects

If it’s a condo, five things decide the layout

Houses give you room to move services around. Condos do not, and most of the cost surprises in a condo kitchen come from finding that out late. These are the five the building decides for you.

The stack rarely moves.

Your sink drain ties into a vertical stack shared with the units above and below. Moving it more than a short distance means re-sloping drainage inside the ceiling space, which needs both engineering and board approval. Layouts that respect the stack cost a fraction of layouts that fight it.

Gas is usually off the table.

Most Toronto condo buildings do not permit gas ranges in suites, and many have no gas service at all. Induction is the real answer rather than the consolation prize — faster than gas to boil, and the only cooktop that keeps a recirculating hood honest.

Venting is recirculating, not ducted.

Cutting a new exterior vent through a building envelope is almost never approved. A properly sized recirculating hood with a real carbon filter handles a condo kitchen; what fails is an undersized decorative hood chosen for how it looks in the drawing.

The floor is a structural slab.

Nothing gets buried below the finished floor without permission, because the concrete under it is holding the building up. Island plumbing and electrical either run within the existing floor build-up or the island goes somewhere else.

The board sets the calendar.

Alteration approval, certificates of insurance, elevator booking and permitted work hours all sit ahead of demolition. We prepare and chase that package as part of the job, which is why our schedules hold when others slip in week one.

Before and after

The same kitchen after renovation — black zellige tile, dark stained oak cabinetry, honed concrete counters and matte black tapware
Dated condo kitchen before renovation — dark stained raised-panel cabinets, penny-round tile backsplash and mottled granite counters
Drag to compare
Liberty Village · 2 bed

Builder-grade kitchen to a full rebuild in nine weeks

Layout held to the existing stack, cabinetry drawn to the ceiling, honed concrete counters. Priced in March, handed over on the date we promised.

Explore our projects

Kitchens we've built

All projects
Yorkville condo dining area with sculptural glass partition and terracotta dining chairs

Yorkville Two-Bed

Kitchen + baths Yorkville
Fort York condo kitchen with marble island, leather bar stools and olive cabinetry

Fort York Kitchen

Kitchen Fort York

Kitchen questions, answered

What condo owners ask before the drawings start.

Can I move the sink in a condo kitchen?

A short distance, usually yes. A long move, rarely — the drain has to maintain fall to the stack, and gaining that fall means building up the floor or working inside the ceiling below, which requires engineering and board approval. We check the stack position at the walkthrough and tell you what your layout options actually cost before you fall in love with one.

Can I put in a gas range?

In most Toronto condos, no — either the building prohibits gas in suites or there is no gas service to the unit. Induction is what we specify, and in a condo it is genuinely the better appliance: it puts less heat and far less combustion residue into a sealed space with recirculating ventilation.

Can I have an island?

It depends on whether it needs plumbing or power. A dry island with no services is usually straightforward. Add a sink or a cooktop and you are into running services through a structural slab, which most buildings will not allow — so the practical answer is often a peninsula tied to an existing wall, or an island that stays dry.

Do I need condo board approval for a kitchen renovation?

Yes, in effectively every Toronto building. Anything touching plumbing, electrical, flooring or the layout requires an alteration agreement, certificates of insurance naming the corporation, and a booked elevator. We prepare and submit that package for you — it is a stage in our process, not homework we hand back.

How long does a condo kitchen renovation take?

On site, typically three to five weeks for a kitchen alone. Design, selections and board approval come before that, and we run them in parallel where we can so they don’t stack up.

What does a condo kitchen renovation cost in Toronto?

Before HST, a condo kitchen typically runs $30,000–$55,000, a house kitchen with the layout unchanged $45,000–$85,000, and an open-concept kitchen with structural work $70,000–$130,000. Cabinetry and stone move the number more than square footage does. After the walkthrough you get a fixed price and a completion date in writing, and any change after that is priced and signed off before it happens.

What countertop do you recommend for a high-end kitchen?

Quartzite, in most of the kitchens we build. It’s a natural stone that’s harder than marble and much less bothered by lemon juice or red wine, and it still has the veining people want when they ask for marble. Some stone sold as quartzite is really a softer dolomite, so test a sample before you commit. We choose the slab with you and lay out the veining before it’s cut. Engineered quartz, Caesarstone for example, is still a good fit if you want an even colour and no sealing, and we install plenty of it.

How do I hire the right team for a kitchen renovation in Toronto?

Ask to see a kitchen they’ve finished, in person if you can, and ask who will actually be in your home each day. Get the scope, the price and the completion date in writing, and find out how changes are priced once work starts. In a condo, ask whether they prepare the board application and insurance certificates themselves, because that’s where a lot of kitchens lose their first few weeks. With us it starts with a free walkthrough at your place. Our founder, Sahand Rabbi, does every one himself.

How do kitchen renovation prices compare between Toronto companies?

Hard to say, because most companies don’t publish prices. The fair test is a written quote from each one for the same scope. Ours are on our pricing page: before HST, a condo kitchen runs $30,000–$55,000, a house kitchen with the layout unchanged $45,000–$85,000, and an open-concept kitchen with structural work $70,000–$130,000. When two quotes are far apart, the gap is usually cabinetry, stone, or something one of them left out, like permits, an electrical upgrade or the building’s elevator fees.

We want an open-concept kitchen. What structural work does that take?

It depends on the wall. A non-structural partition can usually come out with some patching and electrical rerouting. A load-bearing wall needs a beam, so a structural engineer sizes it, we prepare the drawings and apply for the City building permit, and the work is inspected before it’s closed up. In a concrete condo most interior walls aren’t structural, but some hide plumbing, ducts or a column, a few are shear walls that can’t be touched, and the board has to approve the change either way. We tell you which kind of wall you have at the walkthrough. Budget $70,000–$130,000 before HST for an open-concept kitchen with structural work.

What does a kitchen renovation look like from start to finish?

A free walkthrough first: we measure, find the drain stack and talk through how you cook and what bugs you about the kitchen now. Then design, with layout options and what each one costs, followed by cabinetry, stone and appliances. You get a written price and completion date before any work starts, and we handle the board application or permit while selections are being finalized. On site it’s usually three to five weeks: demolition, plumbing and electrical rough-in, cabinets, stone templating and install, then backsplash and fixtures, and a final walkthrough together.

Start with a free walkthrough

We'll measure, find the stack, and tell you what your layout options actually cost.